docs(p0): compact MVP spec for Android Oboe focus
This commit is contained in:
@@ -1,234 +0,0 @@
|
||||
|
||||
# CHANORA_REL_Release_Readiness_Go_NoGo_Record_v0.9.2.2.1
|
||||
|
||||
**Document type:** Release Readiness Checklist / Go-No-Go Record
|
||||
**Version:** 0.9.2
|
||||
**Status:** Baseline Candidate
|
||||
**Language:** English
|
||||
**Product:** Chanora
|
||||
**Repo path:** `docs/release/release-readiness-go-nogo-record.md` ---
|
||||
|
||||
## 1. Purpose
|
||||
|
||||
This document records the auditable release readiness decision for a Chanora release.
|
||||
|
||||
Design documents alone do not authorize release. A release requires an explicit readiness decision based on scope, build identity, requirement completion, verification evidence, security review, platform readiness, legal/privacy readiness, known risks, and approval.
|
||||
|
||||
## 2. Release Identity
|
||||
|
||||
| Field | Value |
|
||||
|---|---|
|
||||
| Release name | TBD by Product Owner |
|
||||
| Release type | TBD: Internal Alpha / External Beta / MVP Public / Store Release |
|
||||
| Release version | TBD |
|
||||
| Release candidate ID | TBD |
|
||||
| Release date target | TBD |
|
||||
| Release owner | TBD |
|
||||
| Product owner | TBD |
|
||||
| Engineering owner | TBD |
|
||||
| QA / verification owner | TBD |
|
||||
| Security reviewer | TBD |
|
||||
| Legal / compliance reviewer | TBD |
|
||||
|
||||
## 3. Build Identity
|
||||
|
||||
| Field | Value |
|
||||
|---|---|
|
||||
| Git repository | TBD |
|
||||
| Git branch | TBD |
|
||||
| Git commit SHA | TBD |
|
||||
| Git tag | TBD |
|
||||
| iOS App Store Connect upload SDK gate | Xcode 26+ and iOS 26 / iPadOS 26 SDK+ for upload on or after 2026-04-28 |
|
||||
| Platform release policy included | Yes |
|
||||
| Build number | TBD |
|
||||
| CI pipeline ID | TBD |
|
||||
| Build timestamp | TBD |
|
||||
| Windows artifact | TBD |
|
||||
| macOS artifact | TBD |
|
||||
| Linux artifact | TBD |
|
||||
| Android artifact | TBD |
|
||||
| iOS artifact | TBD |
|
||||
| Artifact hash method | SHA-256 unless otherwise specified |
|
||||
| Artifact hashes | TBD |
|
||||
|
||||
## 4. Scope Readiness
|
||||
|
||||
| Question | Answer | Evidence | Owner |
|
||||
|---|---|---|---|
|
||||
| Is this release scope defined? | TBD | Release scope statement | Product Owner |
|
||||
| Is this release Internal Alpha, External Beta, MVP Public, or Store Release? | TBD | Release scope statement | Product Owner |
|
||||
| Are included features listed? | TBD | Release notes / scope list | Product Owner |
|
||||
| Are excluded/deferred features listed? | TBD | Deferred requirements list | Product Owner |
|
||||
| Are target platforms listed? | TBD | Platform readiness table | Engineering Owner |
|
||||
| Are known limitations documented? | TBD | Known issue register | Product Owner / QA |
|
||||
|
||||
## 5. Requirements Readiness
|
||||
|
||||
| Requirement group | Status | Evidence | Deferred items / waiver |
|
||||
|---|---|---|---|
|
||||
| P0 / MVP connection requirements | TBD | SRS/SWE.6 evidence | TBD |
|
||||
| P0 / MVP channel and state requirements | TBD | SRS/SWE.6 evidence | TBD |
|
||||
| P0 / MVP voice requirements | TBD | SRS/SWE.6 evidence | TBD |
|
||||
| Audio processing requirements | TBD | SWE.4/SWE.5/SWE.6 evidence | TBD |
|
||||
| Storage and secure storage requirements | TBD | SWE.4/SWE.5/SWE.6 evidence | TBD |
|
||||
| Diagnostics and redaction requirements | TBD | SWE.4/SWE.5/SWE.6 evidence | TBD |
|
||||
| Material 3 / UI requirements | TBD | SWE.6 evidence | TBD |
|
||||
| Accessibility requirements | TBD | SWE.6 evidence | TBD |
|
||||
| Platform behavior requirements | TBD | SYS.4/SWE.6 evidence | TBD |
|
||||
| i18n / Unicode requirements | TBD | SWE.4/SWE.5/SWE.6 evidence | TBD |
|
||||
| Traceability requirements | TBD | Validation report | TBD |
|
||||
|
||||
## 6. Verification Readiness
|
||||
|
||||
| Verification layer | Required evidence | Status | Failed items | Waivers |
|
||||
|---|---|---|---|---|
|
||||
| SWE.4 Unit Verification | Unit verification summary report | TBD | TBD | TBD |
|
||||
| SWE.5 Software Integration Verification | Integration verification summary report | TBD | TBD | TBD |
|
||||
| SWE.6 Software Verification | Software verification summary report | TBD | TBD | TBD |
|
||||
| SYS.4 System Integration Verification | System integration verification summary report | TBD | TBD | TBD |
|
||||
| Regression Verification | Regression report | TBD | TBD | TBD |
|
||||
| Manual exploratory test | Test notes | TBD | TBD | TBD |
|
||||
|
||||
## 7. Security Readiness
|
||||
|
||||
| Question | Required answer | Status | Evidence |
|
||||
|---|---|---|---|
|
||||
| Is secure storage verified for supported platforms? | Yes / waived | TBD | Security test report |
|
||||
| Are secrets excluded from plaintext logs? | Yes / waived | TBD | Redaction test result |
|
||||
| Is diagnostic export redaction verified? | Yes / waived | TBD | Diagnostics audit |
|
||||
| Is dependency/license scan completed? | Yes / waived | TBD | Dependency scan report |
|
||||
| Are high/critical dependency issues resolved or waived? | Yes / waived | TBD | Security waiver record |
|
||||
| Are user-facing errors safe and non-sensitive? | Yes / waived | TBD | Review record |
|
||||
| Are platform permissions justified? | Yes / waived | TBD | Permission review |
|
||||
|
||||
## 8. Platform Readiness
|
||||
|
||||
| Platform | Release status | Build artifact | Verification status | Known blockers | Owner |
|
||||
|---|---|---|---|---|---|
|
||||
| Windows | TBD: Go / Conditional Go / No-Go / Not in scope | TBD | TBD | TBD | TBD |
|
||||
| macOS | TBD: Go / Conditional Go / No-Go / Not in scope | TBD | TBD | TBD | TBD |
|
||||
| Linux | TBD: Go / Conditional Go / No-Go / Not in scope | TBD | TBD | TBD | TBD |
|
||||
| Android | TBD: Go / Conditional Go / No-Go / Not in scope | TBD | TBD | TBD | TBD |
|
||||
| iOS | TBD: Go / Conditional Go / No-Go / Not in scope | TBD | TBD, including Apple App Store SDK gate | TBD | TBD |
|
||||
|
||||
## 9. Legal, OSS, and Privacy Readiness
|
||||
|
||||
| Question | Required answer | Status | Evidence | Owner |
|
||||
|---|---|---|---|---|
|
||||
| Is the app clearly identified as unofficial and not affiliated with TeamSpeak? | Yes | TBD | App copy / legal notice | Legal |
|
||||
| Is the TeamSpeak trademark/non-affiliation wording reviewed? | Yes | TBD | Legal review record | Legal |
|
||||
| Is OSS license review completed? | Yes | TBD | OSS notice / license report | Legal / Engineering |
|
||||
| Are Rust, Flutter, tsclientlib, and platform dependencies included in OSS review? | Yes | TBD | OSS license report | Legal / Engineering |
|
||||
| Is privacy policy completed for the release scope? | Yes | TBD | Privacy policy URL/file | Legal |
|
||||
| Are diagnostics/logging disclosures complete? | Yes | TBD | Privacy policy / in-app notice | Legal / Product |
|
||||
| Are App Store / Play Store metadata requirements complete if applicable? | Yes / N/A | TBD | Store metadata review | Product / Legal |
|
||||
|
||||
## 10. Known Issues and Waivers
|
||||
|
||||
| Issue ID | Description | Severity | Impact | Waiver? | Waiver owner | Expiry / follow-up |
|
||||
|---|---|---|---|---|---|---|
|
||||
| TBD | TBD | TBD | TBD | TBD | TBD | TBD |
|
||||
|
||||
## 10A. Required Security, Privacy, and Legal Evidence
|
||||
|
||||
| Evidence document | Required status before External Beta / Public release |
|
||||
|---|---|
|
||||
| `CHANORA_SEC_Threat_Model_v0.9.2.2.1.md` | Reviewed; v1.0 approved before public release |
|
||||
| `CHANORA_SEC_Secure_Storage_Audit_Report_v0.9.2.2.1.md` | Completed for release-scope platforms |
|
||||
| `CHANORA_SEC_Diagnostic_Redaction_Audit_Report_v0.9.2.2.1.md` | Completed and approved |
|
||||
| `CHANORA_SEC_Dependency_And_Supply_Chain_Report_v0.9.2.2.1.md` | Completed with no unapproved critical/high risk |
|
||||
| `CHANORA_PRIV_Privacy_Policy_v0.9.2.2.1.md` | Legal/privacy reviewed; v1.0 approved before public release |
|
||||
| `CHANORA_LEGAL_Trademark_And_Attribution_Review_v0.9.2.2.1.md` | Legal reviewed; v1.0 approved before public release |
|
||||
|
||||
|
||||
## 10B. Key Product Decision Gate
|
||||
|
||||
| Decision | Required status before Go |
|
||||
|---|---|
|
||||
| Release type | Confirmed |
|
||||
| Release platform scope | Confirmed |
|
||||
| Minimum iOS version | Confirmed |
|
||||
| Apple App Store SDK gate | Confirmed and release-inspected |
|
||||
| Minimum Android version | Confirmed |
|
||||
| Android target SDK policy | Confirmed |
|
||||
| Multiple active connections in MVP | Confirmed |
|
||||
| AEC/AGC/NS/HPF default states | Confirmed |
|
||||
| Audio processing implementation path | Confirmed |
|
||||
| Legal/trademark/licensing review requirement | Confirmed |
|
||||
| Local database choice | Confirmed |
|
||||
| Flutter/Rust bridge choice | Confirmed |
|
||||
| Diagnostics upload policy | Confirmed |
|
||||
| Crash reporting policy | Confirmed |
|
||||
| Product license model | Confirmed or explicitly not required for release scope |
|
||||
|
||||
|
||||
## 11. Release Decision
|
||||
|
||||
| Decision | Meaning |
|
||||
|---|---|
|
||||
| Go | Release is approved for the stated scope and platforms. |
|
||||
| Conditional Go | Release is approved only if listed conditions are satisfied. |
|
||||
| No-Go | Release is not approved. |
|
||||
|
||||
**Decision:** TBD: Go / Conditional Go / No-Go
|
||||
|
||||
## 12. Conditional Go Conditions
|
||||
|
||||
| Condition ID | Condition | Owner | Due date | Evidence required |
|
||||
|---|---|---|---|---|
|
||||
| TBD | TBD | TBD | TBD | TBD |
|
||||
|
||||
## 13. Approval
|
||||
|
||||
| Role | Name | Decision | Date | Evidence / Signature |
|
||||
|---|---|---|---|---|
|
||||
| Product Owner | TBD | TBD | TBD | TBD |
|
||||
| Engineering Owner | TBD | TBD | TBD | TBD |
|
||||
| QA / Verification Owner | TBD | TBD | TBD | TBD |
|
||||
| Security Reviewer | TBD | TBD | TBD | TBD |
|
||||
| Legal / Compliance Reviewer | TBD | TBD | TBD | TBD |
|
||||
| Release Manager | TBD | TBD | TBD | TBD |
|
||||
|
||||
## 14. Change History
|
||||
|
||||
| Version | Date | Description |
|
||||
|---|---|---|
|
||||
| 0.9.0 | 2026-05-14 | Initial release readiness and Go/No-Go record template. |
|
||||
|
||||
|
||||
## Baseline Candidate 0.9.1 Update
|
||||
|
||||
| Version | Date | Description |
|
||||
|---|---|---|
|
||||
| 0.9.1 | 2026-05-14 | Updated baseline after product decision closure: Apple App Store SDK gate uses Xcode 26+ and iOS 26 / iPadOS 26 SDK+ since 2026-04-28, platform baselines and decision traceability propagated across the document set. |
|
||||
|
||||
|
||||
## Baseline Candidate 0.9.2 Update
|
||||
|
||||
| Version | Date | Description |
|
||||
|---|---|---|
|
||||
| 0.9.2 | 2026-05-14 | Corrected Apple App Store Connect upload gate to 2026-04-28 and checked full-package naming, references, and coverage. |
|
||||
|
||||
|
||||
## Desktop Push-to-Talk Release Readiness Addendum (Baseline Candidate 0.9.3)
|
||||
|
||||
The release readiness checklist for every desktop release artefact gains the following items per SysDes-148, SysRS-298, and DEC-023 / DEC-024 / DEC-025 / DEC-026 / DEC-027 / DEC-028.
|
||||
|
||||
| Item | Owner | Evidence required | Status |
|
||||
|---|---|---|---|
|
||||
| RR-PTT-001 Windows Global PTT verified on a Windows reference host. | Windows Platform Owner | Live measurement of `PttCapabilityLevel` + `backend_id` returned at runtime. Backend identifier shall be `raw-input` (preferred) or `low-level-hook` (fallback) for Global. | Open |
|
||||
| RR-PTT-002 macOS Global PTT verified with permission granted on a macOS reference host. | macOS Platform Owner | Live measurement + `permission_state = Granted` reported through the Event-Tap backend; UI capability badge screenshot. | Open |
|
||||
| RR-PTT-003 macOS Focused PTT fallback verified with permission denied. | macOS Platform Owner | Live measurement of `PttCapabilityLevel::L0Focused` after revoking Input Monitoring; UI capability badge screenshot showing the fallback notice. | Open |
|
||||
| RR-PTT-004 Linux Global PTT verified on GNOME-on-Wayland. | Linux Platform Owner | Live measurement returning `gnome-wayland-portal` backend identifier from a live GNOME-on-Wayland host; portal binding dialog screenshot. | **Implemented** (live `CreateSession` + `BindShortcuts` + signal subscription landed in code; awaiting live trace from a GNOME-on-Wayland reference host before the cell can be marked Done). |
|
||||
| RR-PTT-005 Linux Focused fallback verified on a non-tested compositor (any of: X11, sway, KDE) | Linux Platform Owner | Live measurement of `L0Focused` on at least one non-tested compositor; release notes do not claim Global support on the untested environment. | Open |
|
||||
| RR-PTT-006 Diagnostic export carries no key data. | Privacy Reviewer | Inspection of a user-initiated diagnostic export captured while PTT is bound to a real key; export shall contain `capability_level`, `backend_id`, `bound_input_class` and shall not contain a recognisable key code. | Open |
|
||||
| RR-PTT-007 Missed-key-up watchdog timeout demonstrated. | Audio Owner | Test trace showing `transmit_active` clearing after the configured 30 s ceiling when the watchdog forces a release. | **Done (v1.0.0-rc.4)** — covered by `chanora_audio::ptt::tests::watchdog_clears_transmit_after_timeout` (and the negative `watchdog_does_not_clear_on_normal_release`). Live platform trace still required per RR-PTT-001..005. |
|
||||
| RR-PTT-008 Capability badge matches runtime capability on every supported platform. | UX Owner | UI screenshot or platform-test trace. | Open |
|
||||
|
||||
A release decision shall be **No-Go** for any platform whose RR-PTT items are not all closed.
|
||||
|
||||
| Version | Date | Description |
|
||||
|---|---|---|
|
||||
| 0.9.3 | 2026-05-15 | Added desktop PTT release-readiness items RR-PTT-001 through RR-PTT-008 covering Windows / macOS / Linux Global verification, permission-denied fallback verification, diagnostic-export privacy inspection, missed-key-up watchdog test, and capability-badge UI verification. |
|
||||
| 0.9.4 | 2026-05-15 | RR-PTT-007 (missed-key-up watchdog) flipped to Done — the cross-platform `chanora_audio::ptt::MissedKeyUpWatchdog` ships in v1.0.0-rc.4 with two passing unit tests. Live per-platform traces (RR-PTT-001..005, RR-PTT-008) remain required for the live verification phase but are no longer blocked on engineering. |
|
||||
| 0.9.5 | 2026-05-15 | RR-PTT-004 status flipped to Implemented (live trace from a GNOME-on-Wayland reference host pending). The Linux backend now runs the full portal `CreateSession` + `BindShortcuts` + `Activated` / `Deactivated` flow on a dedicated tokio task per backend instance. |
|
||||
Reference in New Issue
Block a user