# ASPICE SWE.2/SWE.3 Integration Note **Document status:** DV meeting baseline candidate **Date:** 2026-05-29 ## 1. Purpose This note explains how Chanora's SWE.2 and SWE.3 documents support downstream verification. ## 2. Lifecycle Chain ```text SysRS -> SysDes -> SRS -> SAD/SWE.2 -> SDD/SWE.3 -> SWE.4/SWE.5/SWE.6/SYS.4 verification ``` ## 3. Integration Points | Process | Chanora document | Verification handoff | |---|---|---| | SWE.2 | `docs/architecture/sad.md` | Defines components, interfaces, runtime flows, dependency rules | | SWE.3 | `docs/architecture/sdd.md` | Defines modules, detailed behavior, data/state design, verification hooks | | SWE.4 | `docs/verification/swe4-unit-verification-plan.md` | Consumes SDD module hooks | | SWE.5 | `docs/verification/swe5-software-integration-verification-plan.md` | Consumes SAD interfaces and SDD integration hooks | | SWE.6 | `docs/verification/swe6-software-verification-plan.md` | Verifies integrated software against SRS | ## 4. DV Conclusion The SWE.2/SWE.3 integration route is documented for DV. Further itemized IDs can be added if required by a stricter process audit.