1.1 KiB
1.1 KiB
ASPICE SWE.2/SWE.3 Integration Note
Document status: DV meeting baseline candidate
Date: 2026-05-29
1. Purpose
This note explains how Chanora's SWE.2 and SWE.3 documents support downstream verification.
2. Lifecycle Chain
SysRS -> SysDes -> SRS -> SAD/SWE.2 -> SDD/SWE.3 -> SWE.4/SWE.5/SWE.6/SYS.4 verification
3. Integration Points
| Process | Chanora document | Verification handoff |
|---|---|---|
| SWE.2 | docs/architecture/sad.md |
Defines components, interfaces, runtime flows, dependency rules |
| SWE.3 | docs/architecture/sdd.md |
Defines modules, detailed behavior, data/state design, verification hooks |
| SWE.4 | docs/verification/swe4-unit-verification-plan.md |
Consumes SDD module hooks |
| SWE.5 | docs/verification/swe5-software-integration-verification-plan.md |
Consumes SAD interfaces and SDD integration hooks |
| SWE.6 | docs/verification/swe6-software-verification-plan.md |
Verifies integrated software against SRS |
4. DV Conclusion
The SWE.2/SWE.3 integration route is documented for DV. Further itemized IDs can be added if required by a stricter process audit.