mirror of
https://github.com/MobileGL-Dev/MobileGL
synced 2026-11-29 04:32:15 +09:00
[docs, MG_Remote] (P6->P6.5): the end state is TCP across machines, and the transport stack has two axes
The end state is re-ruled: client and server may sit on different machines, OSes and architectures, joined over TCP. The AVF pVM / AF_VSOCK end state the P6 end-state review assumed is withdrawn (retraction at its head, form D added to its table, the vsock probe and both external unknowns struck). The transport stack becomes two independently selectable axes, negotiated in the handshake and mixable: control plane (ITransport: fork / unix:<path> / tcp://host:port) and data plane (ILink: ShmLink / StreamLink). On one machine control over TCP with data over shared segments is a legal pair; ShmLink brings its own AF_UNIX aux rendezvous for SCM_RIGHTS, so ITransport narrows to control frames. `auto` is decided by a successful segment delivery, never by inspecting addresses, and a fall-back is named. Nothing above Transport/ may branch on the link kind. ARCHITECTURE.md gains 11.9 for this; CONTRACT-P6.md gains 10.3. ROADMAP: P6.5 and Ph get rows (both were referenced by the contract and absent from the stage table); the IPC track becomes P6 -> P6.5 -> Ph -> P12 -> P9 -> P10 -> P11(same-machine arm). Every later row is reconciled against the tree: items already landed are struck (client vertex arrays, client-minted query handles, credit default 1, SEG_EVENT overflow mechanism), the unreachable P7 gate (`nm | grep glslang` on a server image that IS libMobileGL.so) is replaced by the 184-symbol ratchet share, fixed-width wire form moves from P7 to P6.5, P12 is cut down per the review (server-owned display, no Surface passing), and the debt table's stale claims are corrected: class C is down to two slots, not 15 and not 511; PACK-PBO and the 2 MiB reply cap are P9's, not P6's. Verified against the tree and recorded honestly: the contract's three hs rows (LinkTerms, Refuse, the fingerprint split) never landed - protocol.fbs has neither - so CURRENT_STAGE_PROGRESS.md's claim that S6 ran red is withdrawn and the rows move to P6.5; the 184-symbol ratchet gate does not exist in CI; the server process never initialises PipeStats, so gate 8's `srv=0 srvpark=0` is a structural zero (fix in progress in the tree, not in this commit). check_doc_citations.py: 159 citations, one pre-existing basename ambiguity.
This commit is contained in:
1 parent
94c130d639
commit
872370ba9d
6 files changed
+129
-34
No files matched your search
@@ -9,6 +9,11 @@
|
||||
// ILink's second implementation, DECLARED BY c6 AND IMPLEMENTED BY NOBODY.
|
||||
// Authority: CONTRACT-P6.md §8.4. Its phase is P6.5.
|
||||
//
|
||||
// The link it exists for is TCP across machines (end state re-ruled 2026-09-22,
|
||||
// CONTRACT-P6.md §10.3, ARCHITECTURE.md §11.9), and it is one axis of two: the
|
||||
// control plane (ITransport) is chosen independently, so tcp control + shm data
|
||||
// on one machine is a legal pair and nothing above Transport/ may tell which.
|
||||
//
|
||||
// WHY A HEADER FOR SOMETHING THAT DOES NOT EXIST. ILink's adequacy - "can this
|
||||
// seam name what a byte stream needs?" - is the one claim c6 makes that an
|
||||
// argument cannot settle and a compile can. If ILink cannot express progress
|
||||
|
||||
Reference in new issue
Block a user