Logo
Explore Help
Sign In
swung0x48/MobileGL
Watch 1
Star 0
Fork 0
mirror of https://github.com/MobileGL-Dev/MobileGL synced 2026-11-18 23:43:23 +09:00
Code Issues Packages Projects Releases Wiki Activity
4,141 Commits 21 Branches 0 Tags
03648c27837e1d8ddf6c84fc16b4d07002e19a2b
Commit Graph
2 Commits
Author SHA1 Message Date
swung0x48 74ae652ecd [Docs] (P10): close the phase - CONTRACT-P10 sections 2-3, rulings ID-P10-1..14 with the integration gate, C-MEASUREMENTS (device fence bench, loopback credit 1/2/3, the retrace round-trip census), the roadmap row, the debts P10 hands on, design/09, the phase README and the status page 2026-09-29 05:29:00 -04:00
swung0x48 47bbf5e6fd [Docs] (P10 A): CONTRACT-P10 section 1 - the fence-report protocol, the present-time report, the gates and red-once - with the re-scoped plan and A-FENCE-POLL, the paired host bench and the llvmpipe finding 2026-09-29 04:34:16 -04:00
Powered by Gitea Version: 1.27.2 Page: 114ms Template: 2ms
Auto
English
Bahasa Indonesia Deutsch English Español Français Gaeilge Italiano Latviešu Magyar nyelv Nederlands Polski Português de Portugal Português do Brasil Suomi Svenska Türkçe Čeština Ελληνικά Български Русский Українська فارسی മലയാളം 日本語 简体中文 繁體中文(台灣) 繁體中文(香港) 한국어
Licenses API