- MOBILEGL_IPC_E2_DROP_DRAW and MOBILEGL_IPC_E2_DROP_CLEAR leave the shipped emitter with their per-draw and per-clear branches, setters, counters and per-frame evidence line; nothing sets them since the dropped-draws control left CI
- the wire-volume assertion on the OpenRA split legs replaces the control (758 DrawVbo records and 758/788 server draws locally, both backends, inproc and spawn)
- retire the unit case RemoteEmitTable.TheE2DropSwitchStartsDisarmed, which only toggled the clear setter; skip census: removed from junit-integration-split-strict/unit-strict (test/unit and unit-split borrow that list)
- retrace-split loses its two negative controls, which re-ran every leg (~68 runner-min per run), and its dependency on the monolith-control artifact; the in-test evidence check from the previous commit replaces them
- build-linux-monolith-control keeps its zero-MG_Remote proof and its upload; on the disaggregation branches the new retrace-shipped job replays OpenRA on both backends through that library (elsewhere the retrace job's library has that shape), so the shipped shape is still replayed on every branch
- delete retrace_transport_control.sh, retrace_drop_draw_control.sh, their smoke cases and stub modes, and the uncalled redcheck_control_smoke_test.sh
- control-runtime/build-push-control leaves the eleven metadata loops; remove-artifact-clutter waits for retrace-shipped