Commit Graph
3 Commits
Author SHA1 Message Date
swung0x48 41b35536e3 [Docs] (P12): record post-review verification 2026-09-25 01:34:29 -04:00
swung0x48 0fe015886e [Docs] (Disaggregated): the top-level files become short indexes in plain language; the design text moves to design/, the how-to and reference material to guide/
- README, ARCHITECTURE, ROADMAP, MEASUREMENTS and CURRENT_STAGE_PROGRESS are rewritten as indexes
  (84 KB -> 15 KB): what the project is, where it stands, and where each detail lives. ROADMAP is one
  plain sentence per phase; MEASUREMENTS is the five conclusions that matter plus one line per phase;
  CURRENT_STAGE_PROGRESS is the P12 goal, a checklist and the next steps.
- ARCHITECTURE's body moves unchanged into ten design/ files, keeping §1-§17 and appendices A/B, so
  `ARCHITECTURE.md §N` references in code resolve through the table in ARCHITECTURE.md.
- guide/ holds build-and-run, code map, glossary and the engineering discipline (from README and
  ROADMAP), and the device pinning record that used to sit in devices/.
- The open-debt table moves to notes/DEBTS.md; the detailed current-stage tables (with decision IDs,
  the open line items and evidence locations) move into notes/p12/README.md. notes/README.md maps
  every moved path and section.
- The documentation citation lint in test.yml also covers design/ and guide/, which describe the
  current tree as the top-level files did.
2026-09-24 22:39:46 +00:00
swung0x48 43b5cfa94e [Docs] (Disaggregated): the four index documents keep only summaries, and every phase's detail lives in its own notes/<phase>/README.md
- ROADMAP, MEASUREMENTS and ARCHITECTURE are rewritten as summaries (333 KB of index text -> 84 KB).
  ROADMAP's phase table is one line per phase plus a link; MEASUREMENTS keeps headline numbers under
  its old §1-§13 numbering (plus §14-§16 for P6.5, P7 and P12); ARCHITECTURE keeps every decided rule
  under the same §1-§17 / appendix numbering, so the `ARCHITECTURE.md §N` references in code still
  land, and §17 becomes an index of the phase landing shapes.
- CURRENT_STAGE_PROGRESS now describes the current stage (the P12 on-screen-server subset) and absorbs
  CURRENT_STAGE_STATUS, which is removed. The P7 status tables, the P6 closing snapshot and the P6.5
  first-wave snapshot move to notes/p7, notes/p6 and notes/p65.
- Each phase gets notes/<phase>/README.md: a short summary, then the verbatim material that left
  the index documents (its ROADMAP row, its MEASUREMENTS section with subsection numbers kept, its
  ARCHITECTURE §17 part, milestones) and a file index. P8-P11 and P13 get their planned scope;
  the full open-question list moves to notes/OPEN-QUESTIONS.md.
- The phase reports that sat at the top level move into their phase folders with unchanged names:
  P5D-INPROC-PERFORMANCE, P5E-RUNAHEAD, P5F-WIRE-COMPLETENESS, P6-SPAWN-PLAN, P6-CONTRACT-DRAFT,
  P6-ENDSTATE-REVIEW. Their relative links, CONTRACT-P6.md's links to them and one tool docstring
  are updated; notes/README.md maps every old path and section number to its new place.
- 71 files under notes/recovered/ that were byte-identical copies of phase-folder files are removed.
- Corrections made while condensing: the server process reads Transport as Spawn (CONTRACT-P6 §3.1
  amended the old "child forces monolith" rule); both backends now publish kCapRunAheadApply;
  MOBILEGL_IPC_RESPAWN is a named refusal and MOBILEGL_IPC_IDLE_EXIT_S is not parsed; the Redmi
  pin row is in tools/device_bench/pin_device.sh.

check_doc_citations over docs/Disaggregated/*.md: 0 problems. No relative link is newly broken.
2026-09-24 22:21:09 +00:00