swung0x48
|
648800a2da
|
[Docs] (P8): close the phase - ruling ID-P8-19 (the exit device check and the P12 cross-host rerun), the P8 README and PLAN, the roadmap row and header, MEASUREMENTS row 19, the status page and the last debt
|
2026-09-30 08:25:38 -04:00 |
|
swung0x48
|
307267c188
|
[Docs] (P8): the monolith defect count is 12 (13 reports, one duplicate between C and D), 9 of them left to P13, not 14 and 11
|
2026-09-30 03:24:47 -04:00 |
|
swung0x48
|
cbbaf77f6d
|
[Docs] (P8): wave 1 integrated - rulings ID-P8-5..13 (the survey, packages A-F, the integration gate, the wave 2 scope and the monolith defects left to P13), the survey note, open questions 9/11/15 answered, the debts and the P8 contract amendments, the P8 README table, PLAN-P8 wave 2 and the status page
|
2026-09-30 03:09:09 -04:00 |
|
swung0x48
|
8d3e2317a6
|
[Docs] (P8): re-scope the phase - strike the original scope in the roadmap and the P8 README, add PLAN-P8 (six items closed, packages P8-0 and A-G, the rewritten gates) and rulings ID-P8-1..4, and mark P8 in progress on the status page
|
2026-09-29 21:31:15 -04:00 |
|