Logo
Explore Help
Sign In
swung0x48/MobileGL
Watch 1
Star 0
Fork 0
mirror of https://github.com/MobileGL-Dev/MobileGL synced 2026-11-16 14:33:24 +09:00
Code Issues Packages Projects Releases Wiki Activity
3,991 Commits 21 Branches 0 Tags
3ce8ce3cb1f4edfb06825adf32e8a125dfd0fb6d
Commit Graph
2 Commits
Author SHA1 Message Date
swung0x48 cbbaf77f6d [Docs] (P8): wave 1 integrated - rulings ID-P8-5..13 (the survey, packages A-F, the integration gate, the wave 2 scope and the monolith defects left to P13), the survey note, open questions 9/11/15 answered, the debts and the P8 contract amendments, the P8 README table, PLAN-P8 wave 2 and the status page 2026-09-30 03:09:09 -04:00
swung0x48 8d3e2317a6 [Docs] (P8): re-scope the phase - strike the original scope in the roadmap and the P8 README, add PLAN-P8 (six items closed, packages P8-0 and A-G, the rewritten gates) and rulings ID-P8-1..4, and mark P8 in progress on the status page 2026-09-29 21:31:15 -04:00
Powered by Gitea Version: 1.27.2 Page: 111ms Template: 2ms
Auto
English
Bahasa Indonesia Deutsch English Español Français Gaeilge Italiano Latviešu Magyar nyelv Nederlands Polski Português de Portugal Português do Brasil Suomi Svenska Türkçe Čeština Ελληνικά Български Русский Українська فارسی മലയാളം 日本語 简体中文 繁體中文(台灣) 繁體中文(香港) 한국어
Licenses API