swung0x48
|
cbbaf77f6d
|
[Docs] (P8): wave 1 integrated - rulings ID-P8-5..13 (the survey, packages A-F, the integration gate, the wave 2 scope and the monolith defects left to P13), the survey note, open questions 9/11/15 answered, the debts and the P8 contract amendments, the P8 README table, PLAN-P8 wave 2 and the status page
|
2026-09-30 03:09:09 -04:00 |
|