Commit Graph
2 Commits
Author SHA1 Message Date
swung0x48 8349babe90 [Docs] (Disaggregated): consolidate into a single MGPipe plan and drop the replica plan
- docs/Disaggregated/PLAN.md is now the one plan: the MGPipe design with the transport, control-plane, present, threading, EGL/process, monolith/build chapters inlined as real chapters (7-13) instead of references, sections renumbered 0-17 + appendices, every internal citation updated
- the replica-GLContext plan and its review record are removed at the user's request; REVIEW.md is the MGPipe design-competition and adversarial-review record only, with the comparison verdicts dropped and the remaining finding text reworded to the new section numbers
- day-43 GO/NO-GO now names its two outcomes (continue / shrink to headless tooling or re-evaluate) without any rollback path
2026-09-05 14:06:24 -04:00
swung0x48 8b31de2f8d [Docs] (Disaggregated): land the two-process split plan - server runs the unchanged backends against a replica GLContext driven by mutator replay, the client is the sole originator of every implicit-publish semantic (persistent-map push, MarkGpuWritten, texture dirty clear, XFB accounting, generated-mip allocation), SPSC shm ring with FlatBuffers structs on the hot path and tables on the control socket, two-way doorbells, present credit 1, spawn-only shipping build with an inproc CI variant, and a P0-P9 schedule gated on the existing unit/integration/retrace/CTS suites; plus the design-competition and adversarial-review record 2026-09-05 09:21:58 -04:00