swung0x48
|
cbbaf77f6d
|
[Docs] (P8): wave 1 integrated - rulings ID-P8-5..13 (the survey, packages A-F, the integration gate, the wave 2 scope and the monolith defects left to P13), the survey note, open questions 9/11/15 answered, the debts and the P8 contract amendments, the P8 README table, PLAN-P8 wave 2 and the status page
|
2026-09-30 03:09:09 -04:00 |
|
swung0x48
|
74ae652ecd
|
[Docs] (P10): close the phase - CONTRACT-P10 sections 2-3, rulings ID-P10-1..14 with the integration gate, C-MEASUREMENTS (device fence bench, loopback credit 1/2/3, the retrace round-trip census), the roadmap row, the debts P10 hands on, design/09, the phase README and the status page
|
2026-09-29 05:29:00 -04:00 |
|
swung0x48
|
f018c0ef05
|
[Feat] (MG_Remote, P5b sync): migrate fence lifecycle and wait replies to the apply thread
|
2026-09-16 13:46:49 -04:00 |
|
swung0x48
|
56c6e49d1d
|
[Feat] (MG_Remote): lower named framebuffer blits through scoped wire bindings
|
2026-09-16 13:44:35 -04:00 |
|
swung0x48
|
538c3c19ee
|
[Docs] (MG_Remote): CONTRACT-P5B.md - the wire records, sinks, refusals and rulings for the 25 measured class-C slots
|
2026-09-16 11:15:45 -04:00 |
|