mirror of
https://github.com/MobileGL-Dev/MobileGL
synced 2026-11-07 01:53:24 +09:00
- ROADMAP, MEASUREMENTS and ARCHITECTURE are rewritten as summaries (333 KB of index text -> 84 KB). ROADMAP's phase table is one line per phase plus a link; MEASUREMENTS keeps headline numbers under its old §1-§13 numbering (plus §14-§16 for P6.5, P7 and P12); ARCHITECTURE keeps every decided rule under the same §1-§17 / appendix numbering, so the `ARCHITECTURE.md §N` references in code still land, and §17 becomes an index of the phase landing shapes. - CURRENT_STAGE_PROGRESS now describes the current stage (the P12 on-screen-server subset) and absorbs CURRENT_STAGE_STATUS, which is removed. The P7 status tables, the P6 closing snapshot and the P6.5 first-wave snapshot move to notes/p7, notes/p6 and notes/p65. - Each phase gets notes/<phase>/README.md: a short summary, then the verbatim material that left the index documents (its ROADMAP row, its MEASUREMENTS section with subsection numbers kept, its ARCHITECTURE §17 part, milestones) and a file index. P8-P11 and P13 get their planned scope; the full open-question list moves to notes/OPEN-QUESTIONS.md. - The phase reports that sat at the top level move into their phase folders with unchanged names: P5D-INPROC-PERFORMANCE, P5E-RUNAHEAD, P5F-WIRE-COMPLETENESS, P6-SPAWN-PLAN, P6-CONTRACT-DRAFT, P6-ENDSTATE-REVIEW. Their relative links, CONTRACT-P6.md's links to them and one tool docstring are updated; notes/README.md maps every old path and section number to its new place. - 71 files under notes/recovered/ that were byte-identical copies of phase-folder files are removed. - Corrections made while condensing: the server process reads Transport as Spawn (CONTRACT-P6 §3.1 amended the old "child forces monolith" rule); both backends now publish kCapRunAheadApply; MOBILEGL_IPC_RESPAWN is a named refusal and MOBILEGL_IPC_IDLE_EXIT_S is not parsed; the Redmi pin row is in tools/device_bench/pin_device.sh. check_doc_citations over docs/Disaggregated/*.md: 0 problems. No relative link is newly broken.
P10 — sync / query / present 节奏(待排)
尚未开工。本页保存该阶段在路线图上的完整范围与出口门(2026-09-24 从
ROADMAP.md阶段表移入,原文照录);阶段开工后,计划、裁定与报告都放在本目录。
摘要
- 轮询入口成门铃点 +
MOBILEGL_IPC_POLL_ESCALATE;DirectGLES 的 fence 完成度改为逐 fence 退休;非 present fence tick;PRESENT_CREDIT > 1从未量过(带延迟链路上的首要杠杆);roundtrip 计数器与输入延迟直方图;SetSwapInterval(最后一个手写 class-C)。 - 门:query / XFB /
AsyncCompile场景在 split 下绿;draw / state / upload 路径 roundtrip 读零;credit 1..3 在 TCP loopback 与跨机臂上的配对记录。
阶段表行(原 ROADMAP.md)
- 阶段:P10 sync / query / present 节奏
- 状态:待排
- 落地什么 / 范围:
client 铸造 query handle(已是:QueryCreate为kWaitNone);轮询入口成门铃点 +MOBILEGL_IPC_POLL_ESCALATE(0 处;TCP 上是首要杠杆之一);DirectGLES 的 fence 完成度来自逐 fence 退休(g_completedFrameSerial仍只在Present前进;Magma 那半已由 run-ahead 落地);非 present fence tick(唯一记载处);present1:1(已是);credit 默认 1(已是默认,ConfigLoader.cpp:414);PRESENT_CREDIT > 1从未量过(重审 §8.7)——带延迟链路上的首要杠杆,inproc 臂上即可取;roundtrip 计数器与输入延迟直方图(今天只有MapPersistentRoundtrips);SetSwapInterval(最后一个手写 class-C,EmitTables.cpp:1665) - 验收门 / 证据:query / XFB /
AsyncCompile场景在 split 下绿;trace 上 draw / state / upload 路径 roundtrip 读零;零 timeout 轮询有界退出;credit 1..3 在 TCP loopback 与跨机臂上的配对记录;配对 A/B 记录