- CURRENT_STAGE_PROGRESS.md gains section 2.6: the four packages (pa / mv / gl / ra2), the
admission rule's three disjuncts and which real entry forced each one, coverage going from
116 to 179 entries plus 1357, the race the flip exposed and its root cause, and the finding
that a hard-green strict lane is necessary and NOT sufficient (ID-132). Code head is now
25fba0d5.
- MEASUREMENTS.md gains section 11: the device matrix. The section leads with clock pinning
because the first matrix was run without it and had to be thrown away - monolith's OWN arm
moved 4.43 -> 7.07 ms/frame between two runs, and the SLOWER run was the COOLER one: the
governor had dropped policy0 from 2745 to 748 MHz. It records pin_redmi.sh's write order and
read-back verification, and why pin_device.sh refusing to guess this machine's serial is
correct rather than a gap. Conclusion: at both pinned tiers monolith and run-ahead each hit
the 120 Hz panel ceiling and only lockstep cannot reach it.
- ROADMAP.md's P5e row and status line now say twelve packages landed, run-ahead armed.
The phase is NOT closed: which arm is faster ABOVE the panel ceiling is unanswered (this
device cannot hold a higher clock), and BRIEF-P5E section 3's three negative controls and
section 5's per-package red-once reruns have been reordered by ID-121 to after the lane goes
green, so they have not been executed yet.