swung0x48 be345d711c [Docs] (Disaggregated): P5e progress, in full - the landed-content table, open items, ruling index and phase report
- New P5E-RUNAHEAD.md: P5e's phase report, a sibling of P5D-INPROC-PERFORMANCE.md. It carries
  the twelve-package list, the three defect classes and the lesson each one cost (a runtime arm
  no gate covered / build flavours no gate covered, where the FIRST gate added for them was
  itself a false green / a guard that could never fire), the profile and both device tiers, the
  unfinished items, and the next opportunity run-ahead unlocked.
- CURRENT_STAGE_PROGRESS.md: the stage table's P5e row becomes twelve packages + run-ahead
  armed + ID-80..136; new section 2.7, the P5e landed-content table, in the same shape as
  P5c's and P5b's; section 2.5 retitled as historical; two sections both numbered 4 fixed; five
  P5e entries added to the open items; next-step item 1 rewritten from c0e to the evidence the
  close still lacks; the ruling index extended from ID-79 to the load-bearing entries of
  ID-136.
- ROADMAP.md: the P11 row gains P5e's correction - retiring the draw lockstep did NOT need
  gPipeInputs versioning, because that race was in the metadata scalars. The row still holds
  for the general case, and contract section 3.2's per-role stamp storage is still unlanded.
- README.md: the status line gains P5e and run-ahead, and "next is P6" becomes "P6 comes after
  P5e".

Doc citation check: 3 problems, all pre-existing entries in CONTRACT-P5.md, none related to