swung0x48 faca09d4ad [CI, docs] (P7): retrace-split exports the iterationrp knobs, and the two new Magma lanes gate
Three changes, one theme - making the two halves comparable, then gating what measured green.

retrace-split's "Retrace and validate under MOBILEGL_TRANSPORT" step exported no Magma knob at
all, while the monolith retrace job (:2183) exports three iterationRP repairs for
minecraft-1.21.4-fabric-iris-iterationrp-in-world x DirectVulkan. Those repairs are tri-state
quirks defaulting to device auto-detection and lavapipe is on no auto list, so that cell of the
split matrix (154 cells, and it contains that case x DirectVulkan x {inproc, spawn}) was being
compared against a monolith control running a different repair set. The same backend+case guard
is now copied verbatim into the split job.

Two gating steps for the lanes this wave added, and ONLY because they measured green on the
first run: integration-magma-{spawn,tcp} run like the existing magma-split step, and the
nineteen application-buffer cases get require_green BY NAME on both new arms - the tcp arm's
required list includes TcpServer.Start / Stop on purpose, because ctest lists the fixture
entries under the label and a lane whose supervisor failed to start has nothing to say about the
nineteen. The informational integration-magma-all-* tier is deliberately in no gating step.

Both steps were executed locally, not merely linted: spawn 19/19 and tcp 19/19 with
"require-green: N PASS, 0 skip, 0 failed, complete discovery". All 99 run: blocks in the
workflow pass bash -n.

The note records the first run in full: per-lane PASS/FAIL/SKIP, the two blocker groups the
first registration attempt produced (both lane plumbing, neither a server abort, wrong pixels
nor a hang), the arming evidence, both red-once demonstrations, the parity and G14 numbers,
what was NOT verified (no device, no retrace run, no G1) and six findings for the integrator -
the first of which is that P7 exit gate 1 has no host-side red list at all, which the wave 2
plan is built on top of.