Files
chanora/docs/references/aspice-swe2-swe3-integration-note.md

1.1 KiB

ASPICE SWE.2/SWE.3 Integration Note

Document status: DV meeting baseline candidate
Date: 2026-05-29

1. Purpose

This note explains how Chanora's SWE.2 and SWE.3 documents support downstream verification.

2. Lifecycle Chain

SysRS -> SysDes -> SRS -> SAD/SWE.2 -> SDD/SWE.3 -> SWE.4/SWE.5/SWE.6/SYS.4 verification

3. Integration Points

Process Chanora document Verification handoff
SWE.2 docs/architecture/sad.md Defines components, interfaces, runtime flows, dependency rules
SWE.3 docs/architecture/sdd.md Defines modules, detailed behavior, data/state design, verification hooks
SWE.4 docs/verification/swe4-unit-verification-plan.md Consumes SDD module hooks
SWE.5 docs/verification/swe5-software-integration-verification-plan.md Consumes SAD interfaces and SDD integration hooks
SWE.6 docs/verification/swe6-software-verification-plan.md Verifies integrated software against SRS

4. DV Conclusion

The SWE.2/SWE.3 integration route is documented for DV. Further itemized IDs can be added if required by a stricter process audit.