Commit Graph
16 Commits
Author SHA1 Message Date
swung0x48 648800a2da [Docs] (P8): close the phase - ruling ID-P8-19 (the exit device check and the P12 cross-host rerun), the P8 README and PLAN, the roadmap row and header, MEASUREMENTS row 19, the status page and the last debt 2026-09-30 08:25:38 -04:00
swung0x48 b4bee9dd38 [Docs] (P8): CONTRACT-P8 (the rules P8 landed, each with its code anchor and its test), rulings ID-P8-14..18 (MD + MF and the create-indirect fixture's alignment, SE, SV, the dev merge, the wave 2 integration gate) and the debts wave 2 hands on 2026-09-30 07:55:50 -04:00
swung0x48 307267c188 [Docs] (P8): the monolith defect count is 12 (13 reports, one duplicate between C and D), 9 of them left to P13, not 14 and 11 2026-09-30 03:24:47 -04:00
swung0x48 cbbaf77f6d [Docs] (P8): wave 1 integrated - rulings ID-P8-5..13 (the survey, packages A-F, the integration gate, the wave 2 scope and the monolith defects left to P13), the survey note, open questions 9/11/15 answered, the debts and the P8 contract amendments, the P8 README table, PLAN-P8 wave 2 and the status page 2026-09-30 03:09:09 -04:00
swung0x48 592558f5fc [Docs] (Debts): the debt review - drop the closed E1, DualBlock and GetCaps-blobref rows (open question 24 closed, the blobref rule now a CONTRACT-P5 row-18 invariant), move the unmeasured M2 note to MEASUREMENTS, rewrite HyperOS / P11 RSS / named refusals, split the P12 row, merge the two CI rows, add three B2 rows, and mark each destination as needing a ruling or ready 2026-09-29 21:12:28 -04:00
swung0x48 0a117243d5 [Docs] (P11): close the phase - rulings ID-P11-17..19 (B2 T0 zero-copy, the stale indexed binding and Magma empty-uniform fixes with the skip-hole, T0 on by default), B2-DEVICE, the P11 README, the roadmap row and header, the status page and the debts P11 hands on 2026-09-29 20:33:00 -04:00
swung0x48 37c7aede31 [Docs] (P11): ruling ID-P11-16 on B1 (fd: endpoint, token broker pairing at hand-off, app_process helper, per-peer apply affinity, the HyperOS battery requirement, the device pass), the B1 debts, the status page, the phase README and the roadmap row 2026-09-29 16:14:18 -04:00
swung0x48 76f75f3a0c [Docs] (P11): ruling ID-P11-15 on the M2 dev merge - the scattered-upload fix completed on the split arms, the trim fence re-audited on the split server, the census and ratchet notes; DEBTS closes the two merged dev bugs and takes M2 leftovers 2026-09-29 13:46:37 -04:00
swung0x48 32b81dae42 [Docs] (P11): the two dev bugs P11 handed on are fixed on dev (Espryt scattered uploads 9524c688; Magma rd12 command-buffer growth d20c2d01) and arrive with the next dev merge 2026-09-29 09:52:37 -04:00
swung0x48 2fcde6eb9b [Docs] (P11): B0-CROSS-APP - SELinux refuses a foreign context the connect to the server app unix endpoint, past a brokered connect the shared segments work unchanged, default placement makes shm slower than tcp; ruling ID-P11-11 on what B1 must build, and the HyperOS uid freeze as a debt 2026-09-29 09:34:26 -04:00
swung0x48 26de2b60fc [Docs] (P11): rulings ID-P11-1..9 with the integration gate, A-DEVICE (T0 is GO from the app domain on both backends; adoption buys RSS not frame time on the Adreno; split T2 costs RSS and p99), the debts the dev merge closes and the ones P11 hands on, and W2-REMINT marking the monolith re-mint fixed 2026-09-29 08:03:09 -04:00
swung0x48 74ae652ecd [Docs] (P10): close the phase - CONTRACT-P10 sections 2-3, rulings ID-P10-1..14 with the integration gate, C-MEASUREMENTS (device fence bench, loopback credit 1/2/3, the retrace round-trip census), the roadmap row, the debts P10 hands on, design/09, the phase README and the status page 2026-09-29 05:29:00 -04:00
swung0x48 de33d40173 [Docs] (P9): close the phase - the contract's remint section and invariants, rulings ID-P9-11..12 with the integration gate, the roadmap row, the debts P9 hands on, the phase README and the status page 2026-09-29 03:36:45 -04:00
swung0x48 acfd367852 [Docs] (P12): the FCL fork's keep-running setting is committed and pushed 2026-09-29 01:10:19 -04:00
swung0x48 743f4e8e6e [Docs] (P12): close the phase - the contract, the disposition of every leftover item, a G1 line that only compares same-machine builds, and the doc citation the docs reshuffle broke 2026-09-29 01:05:45 -04:00
swung0x48 0fe015886e [Docs] (Disaggregated): the top-level files become short indexes in plain language; the design text moves to design/, the how-to and reference material to guide/
- README, ARCHITECTURE, ROADMAP, MEASUREMENTS and CURRENT_STAGE_PROGRESS are rewritten as indexes
  (84 KB -> 15 KB): what the project is, where it stands, and where each detail lives. ROADMAP is one
  plain sentence per phase; MEASUREMENTS is the five conclusions that matter plus one line per phase;
  CURRENT_STAGE_PROGRESS is the P12 goal, a checklist and the next steps.
- ARCHITECTURE's body moves unchanged into ten design/ files, keeping §1-§17 and appendices A/B, so
  `ARCHITECTURE.md §N` references in code resolve through the table in ARCHITECTURE.md.
- guide/ holds build-and-run, code map, glossary and the engineering discipline (from README and
  ROADMAP), and the device pinning record that used to sit in devices/.
- The open-debt table moves to notes/DEBTS.md; the detailed current-stage tables (with decision IDs,
  the open line items and evidence locations) move into notes/p12/README.md. notes/README.md maps
  every moved path and section.
- The documentation citation lint in test.yml also covers design/ and guide/, which describe the
  current tree as the top-level files did.
2026-09-24 22:39:46 +00:00